If you have questions or comments, join the discussion on our LinkedIn forum. From the 2021 UPC Illustrated Training Manual, Chapter 9, VENTS 905.5 Location of Opening. The vent pipe opening from soil or waste pipe, except for water closets and similar fixtures, shall not be below the weir of the trap. This section is identical to Section 1002.4. A …